The eight-story multifamily high-rise contains 67 apartment units, including 36 efficiency units, 25 one-bedroom units, and four units certified as compliant with the Uniform Federal Accessibility Standards (UFAS).
Planned improvements include installing new packaged terminal air conditioning (PTAC) systems in residential units and removing obsolete heating equipment, boilers, pumps, and rooftop HVAC components. New HVAC systems will also be installed in designated common areas and support spaces, along with associated electrical upgrades. An accessibility evaluation will assess compliance with the Americans with Disabilities Act (ADA) and applicable accessibility standards.
Resident amenities will be enhanced through a redesigned lobby, new community room furniture, and the construction of a pet park. Parking lot improvements will include asphalt paving and new striping.
Interior renovations will include new drywall, metal framing, and flooring in hallways, common areas, and residential units. Electrical upgrades will extend from the main transformer to each apartment’s electrical panel. Bathroom renovations will improve functionality and modernize existing plumbing facilities.
All work will comply with applicable local, state, and federal building codes, accessibility standards, and energy efficiency requirements.
HACP’s Modernization Department will oversee and manage the project.
Construction is expected to take approximately 18 months, with completion anticipated in October 2028. These improvements will support the long-term sustainability of Murray Towers while providing residents with a more modern, comfortable, and accessible living environment.